1. Hardware Level Security Parameter

1.1 Test – Secure Debug Interfaces


Requirement Description

Verify that all hardware and application layer debugging interfaces (such as USB, UART, JTAG, and other serial variants) are either:

  • Disabled in the production configuration, or

  • Protected by strong authentication mechanisms (e.g., complex password, cryptographic access control).

This ensures that no unauthorized physical or remote debugging access can be gained to the DUT.


DUT Confirmation Details

  • OEM Statement: (Insert confirmation from OEM whether any debug interfaces are enabled in production units, with justification.)

  • Observed State: (Insert your observed results after inspection and testing.)


DUT Software Details

  • Software Name/Version: ___________________

  • Build Date: ___________________

  • Build Number: ___________________


Hash Checksum Verification for DUT’s Software Image

  • Algorithm Used: SHA-256 (or other specified algorithm)

  • Expected Hash: ___________________

  • Calculated Hash: ___________________

  • Result: Pass / Fail


DUT Configuration

Provide the relevant device configuration snippet or commands used to confirm the status of debug interfaces. Example:

show hardware status
show interface usb status
show interface uart status

Pre-Conditions

The vendor shall provide:

  1. Datasheet of the SoC being used in the device.

  2. Documentation listing all ports/interfaces enabled in the production devices, along with the corresponding access control mechanism.

  3. Manufacturing/Provisioning process flow for the device.


Test Plan

Total Number of Test Cases: 4

Test Cases:

  1. Physically inspect DUT for exposed debug ports.

  2. Attempt to establish a connection via USB/UART/JTAG ports.

  3. Verify authentication mechanism (if port is enabled).

  4. Confirm that disabling mechanism is irreversible in production units.